PPPL Lab-wide  PROCEDURES  Manual
[The Procedures are PDF files and can be viewed usingAcrobatReader. Click downloadAcrobatReader if you would like a copy.]

The PDF documents listed below are the official versions and are exact replicas of the originals; they contain all Attachments and Temporary Change Requests (TCRs).  Signed originals are maintained by the Best Practices and Outreach Department. Print-out copies of the documents are considered UNCONTROLLED / Information Only Copies and must be marked as such.



Table of Contents

 [SKIP DIRECTLY TO A SECTION BY CLICKING ONE]
GEN-XXX General Procedures
ESH-XXX ES&H Procedures
EWM-XXX ER/WM Procedures
QA-XXX QA Procedures
ENG-XXX Engineering Procedures
PER-XXX Personnel Procedures
TR-XXX Training Procedures
MC-XXX Materiel Control Procedures
PST-XXX Plasma Science & Technology's Procedures

GEN-XXX


GEN-001 "Policy, Procedure, and Mission Statement Development, Review, and Approval" Rev. 3
GEN-001- Procedure with
Attachments 1 through 4
Effective Date:
3/22/11
Responsible Department Head:
DeLooper
Status/Comments:
next review Mar 2014

GEN-003 "Document Distribution Control" Rev. 2
GEN-003,R2-TCR-001 - Procedure with
Attachment 1
Effective Date:
4/23/07
Responsible Department Head:
DeLooper 
Status/Comments:
next review Feb 2014

GEN-004 "Price Anderson Amendments Act Worker Safety & Health Noncompliance Determination and Reporting Process" Rev. 3
GEN-004 - Procedure with
Attachment 1
Effective Date:
12/10/07
Responsible Department Head:
Williams
Status/Comments:
next review Feb 2014

GEN-005 "Modifying the PPPL Master Equipment List" Rev.0
GEN-005,R0-TCR-003 - Procedure with
Attachments 1 and 2
Effective Date:
2/23/98 
Responsible Department Head:
Williams 
Status/Comments:
next review Feb 2013

GEN-006 "Occurrence Reporting and Processing of Operations Information" Rev. 9
GEN-006 - Procedure with
Attachments 1 through 4
Effective Date:
1/13/12
Responsible Department Head:
Levine
Status/Comments:
next review Jan 2015

GEN-007 "Review and Implementation of Laws, Regulations, Standards, and DOE Directives" Rev. 3
GEN-007 - Procedure with
Attachment 1
Effective Date:
1/9/06
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jan 2009
revision due 5/30/11

GEN-008 "Coordination of Visits, Assignments and Collaborations at PPPL" Rev. 5
GEN-008 - Procedure with
Attachments1 through 12
Effective Date:
11/13/09 
Responsible Department Head:
Levine
Status/Comments:
next review Nov 2012

GEN-009 "GPP Prioritization" Rev. 2
GEN-009 - Procedure with
Attachments 1 and 2
Effective Date:
11/4/10 
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2013

GEN-011 "ES&H Deficiency Reporting" Rev.3
GEN-011,R3-TCR-001- Procedure with
Attachments 1 and 2
Effective Date:
9/15/06
Responsible Department Head:
Levine 
Status/Comments:
next review Jun 2013

GEN-014 "Small Business Innovative Research (SBIR)" Rev.0
GEN-014- Procedure
Effective Date:
1/31/95 
Responsible Department Head:
Efthimion 
Status/Comments:
next review Feb 2010

GEN-015 "Procedure for Research Sponsored by Non-DOE Entities" Rev. 3
GEN-015 - Procedure with
Attachments 1 through 5
Effective Date:
2/3/10
Responsible Department Head:
Winkler 
Status/Comments:
next review Feb 2013

GEN-023 "Records Management" Rev. 1
GEN-023 - Procedure with
Attachments 1 through 10
Effective Date:
8/17/04
Responsible Department Head:
MacPherson
Status/Comments:
next review Apr 2014

GEN-027 "Obtaining Goods and Services from Contractor Affiliated Sources (Princeton University)" Rev. 0
GEN-027,R0-TCR-001 Procedure
Effective Date:
6/14/04 
Responsible Department Head:
Winkler
Status/Comments:
next review Jun 2013

GEN-028 "Approval of Used, Reconditioned or Remanufactured Equipment or Supplies Purchases" Rev. 0
GEN-028 Procedure with
Attachment 1
Effective Date:
11/30/06 
Responsible Department Head:
Winkler
Status/Comments:
next review Nov 2012

GEN-029 "Investigation and Follow-up of Adverse Events and Conditions" Rev. 2
GEN-029 Procedure with
Attachments 1 through 4
Effective Date:
6/5/09
Responsible Department Head:
DeLooper
Status/Comments:
next review Jun 2012

GEN-030 "PPPL Commitment Tracking and Reporting Protocol" Rev. 0
GEN-030 Procedure with
Attachment 1
Effective Date:
8/31/09
Responsible Department Head:
DeLooper
Status/Comments:
next review Aug 2012

GEN-031 "Publishing and Patent Clearance of Scientific and Technical Papers and Information " Rev. 0
GEN-031 Procedure with
Attachments 1 and 2
Effective Date:
8/10/11
Responsible Department Head:
DeLooper
Status/Comments:
next review Aug 2014

GEN-032 "Sharing PPPL Theory and Computation Department Codes with Researchers at Other Institutions" Rev. 0
GEN-032 Procedure with
Attachments 1 and 2
Effective Date:
8/29/11
Responsible Department Head:
DeLooper
Status/Comments:
next review Aug 2014

GEN-033 "PPPL Management Group and PPPL Advisory Board" Rev. 0
GEN-033 Procedure with
Attachment 1
Effective Date:
10/10/11
Responsible Department Head:
DeLooper
Status/Comments:
next review Oct 2014

ESH-XXX


ESH-001 "Use of Safety, Accident Prevention, and Equipment Protection Tags" Rev. 3
ESH-001 Procedure with
Attachments 1 and 2
Effective Date:
6/8/07
Responsible Department Head:
Levine 
Status/Comments:
next review Jun 2013

ESH-002 "Facility Safety Signs and Barricade Tapes" Rev. 4
ESH-002 Procedure with
Attachments 1 through 3
Effective Date:
2/4/10
Responsible Department Head:
Levine 
Status/Comments:
next review Feb 2013

ESH-004 "Job Hazard Analysis" Rev. 4
ESH-004 Procedure with
Attachments 1 through 3
Effective Date:
10/28/08
Responsible Department Head:
Levine 
Status/Comments:
next review Oct 2011
revision due 12/30/11

ESH-008 "Access to Radiologically Controlled Areas (RCAs)" Rev. 4
ESH-008 Procedure with
Attachment 1
Effective Date:
1/23/09
Responsible Department Head:
Levine 
Status/Comments:
next review Jan 2012
revision due 4/30/12

ESH-013 "Non-Emergency Environmental Release-Notification and Reporting" Rev. 3
ESH-013,R3-TCR-001 Procedure with
Attachments 1 through 4
Effective Date:
1/31/08
Responsible Department Head:
Levine
Status/Comments:
next review Apr 2014

ESH-014 "National Environmental Policy Act (NEPA) Review System" Rev. 4
ESH-014,R4-TCR-004 - Procedure with
Attachments 1 through 4
Effective Date:
1/4/02 
Responsible Department Head:
Levine 
Status/Comments:
next review Jan 2015

ESH-015 "Hazard Assessment by Emergency ResponseZone" Rev. 1
ESH-015- Procedure with
Attachment 1
Effective Date:
8/15/08
Responsible Department Head:
Levine
Status/Comments:
next review Aug 2011

ESH-016 "Control of Hazardous Energy (Lockout/Tagout)" Rev. 4
ESH-016,R4-TCR-003 - Procedure with
Attachments 1 and 2
Effective Date:
5/11/07
Responsible Department Head:
Williams
Status/Comments:
next review Jul 2014

EWM-XXX


EWM-001 "Hazardous Waste Management" Rev. 3
EWM-001,R3-TCR-002- Procedure with
Attachment 1
Effective Date:
12/6/05
Responsible Department Head:
  Levine
Status/Comments:
next review Dec 2014

EWM-004 "Satellite Accumulation Areas" Rev.1
EWM-004,R1-TCR-003- Procedure with
Attachment 1
Effective Date:
5/10/02 
Responsible Department Head:
  Levine
Status/Comments:
next review Dec 2014

EWM-005 "Asbestos Management Services" Rev. 3
EWM-005 - Procedure with
Attachment 1
Effective Date:
8/22/11
Responsible Department Head:
Levine
Status/Comments:
next review Aug 2014

EWM-007 "Air Environmental Permitting and Monitoring Program Requirements" Rev. 0
EWM-007,R0-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
3/8/05 
Responsible Department Head:
Levine
Status/Comments:
next review Jan 2011
revision due 7/31/11

QA-XXX


QA-002 "PPPL Audit Program" Rev. 7
QA-002,R7-TCR-003 - Procedure with
Attachment 1
Effective Date:
12 /22/06
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jun 2013

QA-003 "Procurement Quality Assurance" Rev. 3
QA-003,R3-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
7/24/07
Responsible Department Head:
DeLooper 
Status/Comments:
next review Apr 2014

QA-004 "PPPL Site Inspection Program" Rev. 1
QA-004,R1-TCR-003 - Procedure with
Attachments 1 and 2
Effective Date:
3/3/99 
Responsible Department Head:
DeLooper 
Status/Comments:
next review Apr 2014

QA-005 "Control of Nonconformances" Rev. 4
QA-005 - Procedure with
Attachments 1 through 4
Effective Date:
7/19/11
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jul 2014

QA-009 "DCMA Vendor Surveillance Delegation" Rev. 3
QA-009 -  Procedure
Effective Date:
3/24/09
Responsible Department Head:
DeLooper 
Status/Comments:
next review Mar 2012

QA-012 "Corrective Action Request" Rev. 2
QA-012 - Procedure with
Attachment 1
Effective Date:
06/22/01 
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jun 2013

QA-017 "PPPL Tracking and Trending System" Rev. 5
QA-017 - Procedure
Effective Date:
2/4/11 
Responsible Department Head:
DeLooper 
Status/Comments:
next review Feb 2014

QA-019 "Root Cause Analysis" Rev. 4
QA-019,R4-TCR-002 - with
Attachments 1 through 7
Effective Date:
8/4/08
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jan 2015

QA-020 "Identifying and Dispositioning Suspect Parts" Rev. 0
QA-020,R0-TCR-002 - Procedure with
Attachment 1
Effective Date:
8/4/00 
Responsible Department Head:
DeLooper 
Status/Comments:
next review Apr 2014

QA-023 "Design and Improvement of Processes" Rev. 1
QA-023 - Procedure with
Attachments 1 and 2
Effective Date:
10/17/11 
Responsible Department Head:
DeLooper 
Status/Comments:
next review Oct 2014

QA-025 "Management Assessments" Rev. 0
QA-025,R0-TCR-001 - Procedure with
Attachments 1 through 3
Effective Date:
5/24/11
Responsible Department Head:
DeLooper 
Status/Comments:
next review Jul 2014

ENG-XXX

 

ENG-005 "General Plant Projects Administration" Rev. 3
ENG-005 - Procedure
Effective Date:
11/4/10
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2013

ENG-006 "Preparation, Review and Approval of Specifications & Statements of Work" Rev. 3
ENG-006,R3-TCR-001 - Procedure with
Attachments 1 through 6
Effective Date:
1/8/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2013

ENG-007 "Reliability, Availability, and Maintainability (RAM) Modeling and Apportionment" Rev. 1
ENG-007- Procedure with
Attachments 1 and 2
Effective Date:
11/30/11
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2014

ENG-008 "Failure Modes and Effects Analysis"Rev. 0
ENG-008,R0-TCR-001 - Procedure with
Attachments 1 through 3
Effective Date:
4/20/99 
Responsible Department Head:
Williams 
Status/Comments:
next review May 2013

ENG-009 "Electric Service Load Reduction" Rev. 3
ENG-009,R3-001 - Procedure
Effective Date:
2/12/09
Responsible Department Head:
Williams 
Status/Comments:
next review Feb 2015

ENG-010 "Control of Drawings, Software, and Firmware" Rev. 5
ENG-010 - Procedure with
Attachments 1 and 2
Effective Date:
8/23/11
Responsible Department Head:
Williams 
Status/Comments:
next review Aug 2014

ENG-011 "Interlock Key Control" Rev. 3
ENG-011 - Procedure with
Attachment 1
Effective Date:
7 /27/04
Responsible Department Head:
Williams 
Status/Comments:
next review Aug 2010

ENG-012 "Identification & Control of Items"Rev. 0
ENG-012 - Procedure
Effective Date:
9/10/98 
Responsible Department Head:
Williams 
Status/Comments:
next review Sep 2013

ENG-014 "Hydrostatic and Pneumatic Testing" Rev. 2
ENG-014 - Procedure with
Attachments 1 through 3
Effective Date:
1/30/12
Responsible Department Head:
Williams 
Status/Comments:
next review Jan 2015

ENG-016 "PPPL Preventive Maintenance Program" Rev. 3
ENG-016 - Procedure with
Attachment 1
Effective Date:
10/21/11
Responsible Department Head:
Williams 
Status/Comments:
next review Oct 2014

ENG-019 "PPPL Engineering Standards" Rev. 3
ENG-019,R3-TCR-001 - Procedure
Effective Date:
2/26/08
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2014

ENG-020 "Project Execution Plan" Rev. 1
ENG-020,R1-TCR-001- Procedure with
Attachment 1
Effective Date:
3/11/05
Responsible Department Head:
Williams 
Status/Comments:
next review  Apr 2014

ENG-021 "Hoisting and Rigging Program" Rev. 4
ENG-021 with
Attachment 1
Effective Date:
11/6/08
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2011

ENG-022 "Scheduled Site Power Outage Notification" Rev. 1
ENG-022,R1-TCR-001 - Procedure with
Attachments1 and 2
Effective Date:
3/2/99 
Responsible Department Head:
Williams 
Status/Comments:
next review Jun 2014

ENG-024 "Digging Permits" Rev. 3
ENG-024,R3-TCR-002- Procedure with
Attachment 1
Effective Date:
8/16/04
Responsible Department Head:
Williams 
Status/Comments:
next review  Feb 2014

ENG-025 "Impairments of Fire Dampers and Fire Doors" Rev. 3
ENG-025- Procedure with
Attachments 1 and 2
Effective Date:
5/22/09
Responsible Department Head:
Williams
Status/Comments:
next review Jun 2012

ENG-026 "Fire and Life Safety Systems" Rev. 4
ENG-026 - Procedure
Effective Date:
3/7/11
Responsible Department Head:
Williams 
Status/Comments:
next review Mar 2014

ENG-027 "Fire Barrier Penetration Seal Installation and Repair" Rev. 4
ENG-027,R4- Procedure with
Attachments 1 through 4
Effective Date:
4/28/10
Responsible Department Head:
Williams
Status/Comments:
next review Apr 2013

ENG-028 "Core Boring, Cutting and Drilling" Rev. 2
ENG-028- Procedure with
Attachments 1 through 5
Effective Date:
4/28/10
Responsible Department Head:
Williams
Status/Comments:
next review Apr 2013

ENG-029 "Technical Definitions & Acronyms" Rev. 1
ENG-029- Procedure
Effective Date:
2 /13/09
Responsible Department Head:
Williams 
Status/Comments:
next review Feb 2012
revision due 4/30/12

ENG-030 "PPPL Technical Procedures for Experimental Facilities" Rev. 2
ENG-030,R2-TCR-002 - Procedure with
Attachments 1 through 9
Effective Date:
2 /13/09
Responsible Department Head:
Williams 
Status/Comments:
next review Aug 2013

ENG-032 "Work Planning Procedure" Rev. 6
ENG-032 - Procedure with
Attachments 1 and 2
Effective Date:
3/4/11
Responsible Department Head:
Williams 
Status/Comments:
next review Mar 2014

ENG-033 "Design Verification" Rev. 4
ENG-033 - Procedure with
Attachments 1 through 7
Effective Date:
4/12/11
Responsible Department Head:
Williams 
Status/Comments:
next review Apr 2014

ENG-034 "Cyber Security Incident Response" Rev. 2
ENG-034,R2-TCR-001 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Baumgartner
Status/Comments:
next review Jan 2015

ENG-036 "Control of Temporary Modifications" Rev. 0
ENG-036 - Procedure with
Attachment 1
Effective Date:
12/8/05
Responsible Department Head:
Williams 
Status/Comments:
next review Sep 2011

ENG-037 "General Welding and Brazing Requirements" Rev. 2
ENG-037 - Procedure with
Attachments 1 through 6
Effective Date:
1/8/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jan 2013

ENG-038 "Welding Materials Control" Rev. 0
ENG-038,R0-TCR-001 - Procedure
Effective Date:
6/10/05 
Responsible Department Head:
Williams 
Status/Comments:
next review Oct 2011

ENG-039 "Computer Center Work Control" Rev. 1
ENG-039 - Procedure with
Attachment 1
Effective Date:
9/5/08
Responsible Department Head:
Baumgartner 
Status/Comments:
next review Sep 2011

ENG-040 "AC Power Switching Orders" Rev. 0
ENG-040 - Procedure with
Attachments 1 through 3
Effective Date:
12/10/08
Responsible Department Head:
Williams 
Status/Comments:
next review Dec 2011

ENG-041 "Electrician Qualification" Rev. 0
ENG-041,R0-TCR-002 - Procedure with
Attachment 1
Effective Date:
1/22/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-042 "Boiler Operator Qualification" Rev. 0
ENG-042,R0-TCR-001 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-043 "Carpenter Qualification" Rev. 0
ENG-043,R0-TCR-001 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-044 "HVAC Mechanic Qualification" Rev. 0
ENG-044,R0-TCR-001 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-045 "Table Top Tool Safety Training, Apprentice Machinist and Qualified Machinist Qualification" Rev. 1
ENG-045 - Procedure with
Attachments 1 through 6
Effective Date:
10/26/11
Responsible Department Head:
Williams 
Status/Comments:
next review Oct 2014

ENG-046 "Metal Fabricator Qualification" Rev. 0
ENG-046,R0-TCR-001 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-047 "Facilities Technician Qualification" Rev. 0
ENG-047 - Procedure with
Attachment 1
Effective Date:
11/24/09
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2012

ENG-048 "Machine/Carpenter Shop Equipment Safety Checklists" Rev. 0
ENG-048 - Procedure with
Attachments 1-12
Effective Date:
6/25/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jun 2013

ENG-049 "Project Status and Oversight" Rev. 0
ENG-049 - Procedure with
Attachment 1
Effective Date:
6/24/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jun 2013

ENG-050 "Job Requirements Documentation and Control" Rev. 1
ENG-050 - Procedure with
Attachment 1
Effective Date:
10/7/11
Responsible Department Head:
Williams 
Status/Comments:
`next review Oct 2014

ENG-051 "Facilities and Infrastructure Mission Readiness" Rev. 0
ENG-051 - Procedure with
Attachments 1 through 4
Effective Date:
7/2/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2013

ENG-052 "Operating Expense (OPEX) Projects Prioritization and Administration" Rev. 0
ENG-052 - Procedure with
Attachments 1 through 2
Effective Date:
7/2/10
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2013

ENG-053 "Job Cost Estimate Development & Review" Rev. 0
ENG-053 - Procedure
Effective Date:
11/17/10
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2013

ENG-057 "COG, RLM, and Project Manager Selection and Training" Rev. 0
ENG-057,R0-TCR-001 - Procedure
Effective Date:
5/16/11
Responsible Department Head:
Williams 
Status/Comments:
next review Jan 2015

PER-XXX


PER-006 "PPPL Guided Tour Program and Escort Responsibilities" Rev.3
PER-006,R3-TCR-002 - Procedure with
Attachments 1 through 3
Effective Date:
7/20/04
Responsible Department Head:
MacPherson 
Status/Comments:
next review Apr 2014

TR-XXX


TR-001 "Laboratory Training Program" Rev. 4
TR-001- Procedure
Effective Date:
1/18/10
Responsible Department Head:
Murphy-LaMarche 
Status/Comments:
next review Jan 2013

TR-005 "Instructor Qualification and Requalification" Rev. 2
TR-005 - Procedure with
Attachments 1 through 4
Effective Date:
1/18/10
Responsible Department Head:
Murphy-LaMarche 
Status/Comments:
next review Jan 2013

TR-006 "Establishing Qualification and Certification Requirements" Rev. 2
TR-006 - Procedure with
Attachments 1 through 9
Effective Date:
1/18/10 
Responsible Department Head:
Murphy-LaMarche 
Status/Comments:
next review Jan 2013

TR-007 "Guidelines for Developing Training Matrices" Rev. 2
TR-007 - Procedure with
Attachments 1 and 2
Effective Date:
7/23/10
Responsible Department Head:
Murphy-LaMarche 
Status/Comments:
next review Jul 2013

MC-XXX


MC-001 "Control of Government-Owned Property" Rev. 1
MC-001,R1-TCR-001 - Procedure with
Attachment 1
Effective Date:
9/12/07
Responsible Department Head:
Williams 
Status/Comments:
next review Nov 2013

MC-002 "Loan of Equipment or Material from PPPL to International Governments or Organizations" Rev. 2
MC-002,R2-TCR-002 Procedure with
Attachments 1 and 2
Effective Date:
9/11/03 
Responsible Department Head:
Williams 
Status/Comments:
next review Oct 2009

MC-003 "Loan of Government Equipment/Material from PPPL to Domestic Organizations" Rev. 4
MC-003 - Procedure with
Attachments 1, 2 and 3
Effective Date:
3/10/11
Responsible Department Head:
Williams 
Status/Comments:
next review Mar 2014

MC-004 "Acquisition and Disposal of Excess Government Property" Rev. 1
MC-004,R1-TCR-001 - Procedure with
Attachments 1, 2, 3, and 4
Effective Date:
3/9/07
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2014

MC-005 "Shipment of Equipment/Material to Off-Site Location" Rev. 2
MC-005 - Procedure with
Attachment 1
Effective Date:
6/24/10 
Responsible Department Head:
Williams
Status/Comments:
next review Jun 2013

MC-006 "Equipment and Materials Held for Future Projects Storage and Review" Rev. 2
MC-006,R2-TCR-002 - Procedure with
Attachment 1
Effective Date:
6/14/04 
Responsible Department Head:
Williams
Status/Comments:
next review Jul 2014

MC-007 "Property Pass Procedures" Rev. 3
MC-007,R3 - Procedure with
Attachments 1 through 7
Effective Date:
9/8/11
Responsible Department Head:
Williams 
Status/Comments:
next review Sep 2014

MC-008 "Reporting Loss, Damage, or Destruction of Government Property" Rev. 0
MC-008,R0-TCR-005
Effective Date:
10/22/93 
Responsible Department Head:
Williams 
Status/Comments:
next review Feb 2015

MC-009 "Adding Material to Stores Inventories" Rev. 1
MC-009,R1-TCR-002 - Procedure with
Attachment 1
Effective Date:
6 /30/04
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2014

MC-010 "Withdrawal of Stores Material" Rev. 1
MC-010,R1-TCR-002 - Procedure with
Attachment 1
Effective Date:
6/15/04 
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2014

MC-011 "Requisition of Office Material and Supplies" Rev. 2
MC-011,R2-TCR-0001 - Procedure with
Attachment 1
Effective Date:
3/14/08
Responsible Department Head:
Williams 
Status/Comments:
next review Jul 2014

MC-012 "Withdrawal of Spare Parts" Rev. 0
MC-012,R0-TCR-004 with
Attachments 1, 2, and 3
Effective Date:
9/1/95 
Responsible Department Head:
Williams 
Status/Comments:
next review Jun 2014

MC-013 "Export Contol" Rev. 1
MC-013 with
Attachments 1 through 6
Effective Date:
2/18/11 
Responsible Department Head:
  Levine
Status/Comments:
next review Feb 2014

PST-XXX


PST-001 "Announcement of Collaborative Research Opportunities" Rev. 0
PST-001 Procedure with
Attachment 1
Effective Date:
10/10/01 
Responsible Department Head:
Efthimion
Status/Comments:
next review Jun 2008

click on this image to go to the PPPL Local home page  home

This page developed and maintained by: Jim Graham- Click on his name to submit comments or ask questions regarding PPPL Procedures/Plans/Policies.

This page last revised by Jim Graham 2/2/12